ci: name the merge-queue fail-fast step after what it means #87

Merged
jmz merged 1 commit from ci/merge-queue-step-text into main 2026-11-25 22:11:49 +00:00
Member

A queued PR's required check fails on purpose: the merge train tests it in its rung PR, and a skipped required job would count as passing. The step was named "Merge queue (fails while the PR is queued)", which turns false once the train landed the PR (a closed PR runs nothing, so its last red check stays). It is now "merge queue: this PR's checks run in the train's rung PR", true while the PR waits and after it landed; the error line says the same.

Workflow-only change; the step's condition is unchanged.

🤖 Generated with Claude Code

https://claude.ai/code/session_01XMf4ELSbWvtUkEeVky4wWr

A queued PR's required check fails on purpose: the merge train tests it in its rung PR, and a skipped required job would count as passing. The step was named "Merge queue (fails while the PR is queued)", which turns false once the train landed the PR (a closed PR runs nothing, so its last red check stays). It is now "merge queue: this PR's checks run in the train's rung PR", true while the PR waits and after it landed; the error line says the same. Workflow-only change; the step's condition is unchanged. 🤖 Generated with [Claude Code](https://claude.com/claude-code) https://claude.ai/code/session_01XMf4ELSbWvtUkEeVky4wWr <!-- claude-session name=merge-train-ui id=e04eea3f-bbed-4211-9356-d7545d911faf host=spl-vm05 -->
ci: name the merge-queue fail-fast step after what it means
All checks were successful
CI / web (pull_request) Successful in 1m19s
CI / go (pull_request) Successful in 12m21s
1b1baf50bd
A queued PR's required check fails on purpose (the train tests it in its
rung PR). The step was named "Merge queue (fails while the PR is queued)",
which turns false once the train landed the PR: a closed PR runs nothing,
so its last red check stays. Name the step "merge queue: this PR's checks
run in the train's rung PR" and word the error the same way, true both
while the PR waits and after it landed.

Co-Authored-By: Claude Opus 5.5 <[email protected]>
Claude-Session: https://claude.ai/code/session_01XMf4ELSbWvtUkEeVky4wWr
Author
Member

merge-train: returned to you (bounced). its base branch main is neither deploy nor the head of an open PR (a landed parent? re-cut it onto the base)

merge-train: returned to you (bounced). its base branch main is neither deploy nor the head of an open PR (a landed parent? re-cut it onto the base) <!-- merge-train outcome=public/wanderer#87:queue:272c6fe8a6ab -->
jmz merged commit 1b1baf50bd into main 2026-11-25 22:11:49 +00:00
jmz deleted branch ci/merge-queue-step-text 2026-11-25 22:11:49 +00:00
Sign in to join this conversation.
No reviewers
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set

Reference
public/wanderer!87
No description provided.