feat(vdirsyncer): sync calendars and contacts every 10 min on Linux #73

Closed
maximus wants to merge 1 commit from feat/vdirsyncer-linux-timer into master
Member

Linux user timer for vdirsyncer (metasync + sync every 10 min), mirroring the mba's ch.swiss-yield.vdirsyncer launchd agent; enabled by run_after_enable-user-services. Skips quietly while rbw is locked; first run does a non-interactive vdirsyncer discover. Needs the khal/vdirsyncer configs from jmz/dotfiles-local feat/pim-linux (the unit is conditioned on ~/.config/vdirsyncer/config existing).

🤖 Generated with Claude Code

https://claude.ai/code/session_01XMf4EHDsxSUaKJC2q1H41t

Linux user timer for vdirsyncer (metasync + sync every 10 min), mirroring the mba's ch.swiss-yield.vdirsyncer launchd agent; enabled by run_after_enable-user-services. Skips quietly while rbw is locked; first run does a non-interactive `vdirsyncer discover`. Needs the khal/vdirsyncer configs from jmz/dotfiles-local feat/pim-linux (the unit is conditioned on ~/.config/vdirsyncer/config existing). 🤖 Generated with [Claude Code](https://claude.com/claude-code) https://claude.ai/code/session_01XMf4EHDsxSUaKJC2q1H41t
feat(vdirsyncer): sync calendars and contacts every 10 min on Linux
All checks were successful
Test Bootstrap Script / End-to-End Bootstrap Test (Alpine) (pull_request) Successful in 28s
ci / gate (pull_request) Successful in 2m33s
392cedcabf
The mba syncs through the ch.swiss-yield.vdirsyncer launchd agent; Linux
workstations (wyse-01, spl-vm08) had no equivalent, so kal/kard there
never saw any data. A user timer mirrors the plist (metasync + sync,
every 10 min). It skips quietly while rbw is locked (the CalDAV password
comes from Vaultwarden there) and runs a non-interactive
`vdirsyncer discover` on a machine that has never synced.

Co-Authored-By: Claude Opus 5.5 <[email protected]>
Claude-Session: https://claude.ai/code/session_01XMf4EHDsxSUaKJC2q1H41t
Author
Member

landed in #74 as 818aa87344

landed in https://git.mirus-tech.com/public/dotfiles-public/pulls/74 as 818aa873446e357587ae379304279fd787a7e1d0 <!-- merge-train outcome=public/dotfiles-public#73:dotfiles-public-20261129-1:1271304c45d6 -->
maximus closed this pull request 2026-11-29 19:41:58 +00:00
All checks were successful
Test Bootstrap Script / End-to-End Bootstrap Test (Alpine) (pull_request) Successful in 28s
ci / gate (pull_request) Successful in 2m33s
Required
Details

Pull request closed

Sign in to join this conversation.
No reviewers
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set

Reference
public/dotfiles-public!73
No description provided.