fix(ci): green the CI pipeline (ruff lint/format) #1

Open
jmz wants to merge 3 commits from fix/ci-green into master
Owner

Fixes the failing test workflow: resolves all ruff lint errors (unused imports, import-sort, UP035, RUF005) and formatting; wraps over-length comments. mypy, pytest, and coverage (>=75%) verified locally.

Fixes the failing `test` workflow: resolves all ruff lint errors (unused imports, import-sort, UP035, RUF005) and formatting; wraps over-length comments. mypy, pytest, and coverage (>=75%) verified locally.
fix(ci): resolve ruff lint/format violations to green the pipeline
Some checks failed
CI / test (pull_request) Failing after 23s
aa634dcd78
fix(ci): make manual checkout work for pull_request events
All checks were successful
CI / test (pull_request) Successful in 25s
daa4e39757
ci: allow manual workflow_dispatch
All checks were successful
CI / test (pull_request) Successful in 27s
7bc9191431
All checks were successful
CI / test (pull_request) Successful in 27s
This pull request can be merged automatically.
You are not authorized to merge this pull request.
View command line instructions

Checkout

From your project repository, check out a new branch and test the changes.
git fetch -u origin fix/ci-green:fix/ci-green
git switch fix/ci-green
Sign in to join this conversation.
No reviewers
No labels
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set

Reference
public/devenv-generator!1
No description provided.